|
Changing the bogeys in a Chinese border shed where the train is divided in two, carriages are raised hydraulically, different-gauge wheels are fitted and then everything’s lowered again, all with the passengers inside the carriage, watching the other half of the train. Trans-Mongolian Railway route.
|
|